STLLR Gold Inc. (TSX: STLR) reported drill results on June 18, 2026 from the 2026 program at the Jonpol Deposit, Garrison Property, Tower Gold Project in the Timmins camp of Ontario.

The best intercepts were 13.00 g/t gold over 22.75 metres and 3.01 g/t gold over 22.93 metres, in hole MGA26-268. The company said the results support continued infill drilling to convert inferred resources to the indicated category.

Source: https://www.juniorminingnetwork.com/junior-miner-news/press-releases/1594-tsx/stlr/205744-stllr-gold-intersects-13-00-g-t-au-over-22-75-m-and-3-01-g-t-au-over-22-93-m-at-the-jonpol-deposit-of-the-tower-gold-project.html